SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:
| Exam Code | C_TS422_2020 |
| Schedule Exam | SAP Training |
| Duration | 180 mins |
| Reference Books | TS421, TS422 (SAP S/4HANA 2020) TS421 (SAP S/4HANA 1909), TS422 (SAP S/4HANA 1909) |
| Exam Name | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing |
| Exam Price | $550 (USD) |
| Passing Score | C_TS422_2020 - 56% C_TS422_1909 - 55% |
| Level | Associate |
| Sample Questions | SAP S/4HANA Production Planning and Manufacturing Certification Sample Questions |
| Number of Questions | 80 |
NEW QUESTION 13
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Product-related
- B. Milestone-related
- C. Order-related
- D. Cost-related
Answer: A,C
NEW QUESTION 14
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-order production (20)
- B. Make-to-stock production (10)
- C. Planning with final assembly (40)
- D. Planning without final assembly (50)
Answer: C
NEW QUESTION 15
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The work center has several individual capacities.
- B. The Change Planning Direct on indicator is set.
- C. Alternative resources are fully occupied.
- D. The planning strategy is infinite.
Answer: A,D
NEW QUESTION 16
When do you use variant bills of materials (BOMB)?
- A. When a material has multiple BOMB
- B. When a material has a configurable BOM
- C. When multiple material also have the same BOM
- D. When multiplematerial is have similar BOMB
Answer: C
NEW QUESTION 17
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the production order type
- B. In the production version
- C. In the MRP controller
- D. In the bill of materials (BOM)
- E. In the routing
Answer: A,C,E
NEW QUESTION 18
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Creation of dependent requirements
- B. Change of the storage bin
- C. Change of the material'sprocurement type
- D. Creation of a purchasing contract
- E. Creation of a sales order
Answer: A,C,E
NEW QUESTION 19
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order generates capacity requirements.
- B. The planned order is converted to a production order.
- C. The planned order's components are copied from the picking list.
- D. The planned order's component availability is checked
Answer: A
NEW QUESTION 20
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Repetitive manufacturing profile
- B. Routing
- C. Production version
- D. Production cost collector
Answer: B,C
NEW QUESTION 21
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- C. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
- D. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
Answer: D
NEW QUESTION 22
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Replenishment strategy
- B. Control cycle
- C. Production supply area
- D. Rate routing
Answer: B
NEW QUESTION 23
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Supply Chain Management (SCM)
- B. Integrated Business Planning (IBP)
- C. Material Requirements Planning (MRP)
- D. Capacity Requirements Planning (CRP)
Answer: A,B
NEW QUESTION 24
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple production versions are maintained for one product
- B. When multiple planned orders exists in one resource
- C. When multiple operations are maintained for one product
- D. When alternate resourcesare used within one operation
Answer: D
NEW QUESTION 25
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Kanban
- B. Picking list
- C. Transfer Order
- D. Backflushing
Answer: B
NEW QUESTION 26
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. To determine the work in progress along the production line
- B. To reduce the totalproduction lead time for along production line
- C. To stage different components for a production line simultaneously
- D. To provide timely updates of inventory management for the staged components
Answer: A,D
NEW QUESTION 27
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.
- A. Float after production
- B. Planned delivery time
- C. Setup time
- D. Total replenishment lead time
Answer: A,B
NEW QUESTION 28
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. MRP Profile
- B. MRP Controller
- C. MRP Group
- D. Plant Data
Answer: C
NEW QUESTION 29
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red
- B. Top of Red Base
- C. Top of Green
- D. Top of Yellow
Answer: C