
Pass SAP C_TS413_2020 With DumpsTorrent Exam Dumps - Updated on Jan-2022
Fully Updated C_TS413_2020 Dumps - 100% Same Q&A In Your Real Exam
SAP C_TS413_2020 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| User Interface and User Experience < 8% | Descibe UI technologies and client types used with SAP S/4HANA Asset Management. |
| Breakdown Maintenance < 8% | Describe and implement the process of breakdown maintenance using traditional and FIORI-based applications. |
| Technical Objects > 12% | Describe and implement technical asset structures following fundamental concepts and building the integration to key neighbour applications. |
| Analytics < 8% | Describe and implement the options for analytics in asset management especially regarding S/4HANA emebedded analytics. |
| Mobile Maintenance < 8% | Describe the available mobile applications for SAP S/4HANA Asset Management |
| Corrective Maintenance > 12% | Describe and implement the process of corrective maintenance using traditional and FIORI-based applications. |
| Organizational Units and Master Data 8% - 12% | Describe and implement the necessary organizational units especially regarding the integration into the general logistics and accounting units. |
| Project-oriented Maintenance < 8% | Describe and implement various scenarios for project-oriented maintenance. |
C_TS413_2020 Exam Certification Details:
| Exam: | 80 questions |
| Cut Score: | 64% |
| Duration: | 180 mins |
| Languages: | German, English |
NEW QUESTION 22
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct Answers to this question.
- A. Work orders and operations
- B. Technical objects
- C. ESRI maps
- D. Cost analytics
- E. Breakdown analytics
Answer: A,B,C
NEW QUESTION 23
How does a performance-based maintenance plan calculate the interval between start date and planned date?
- A. Cycle length divided by (annual performance / 365)
- B. Cycle length divided by annual performance
- C. Cycle length divided by ((scheduling period) x (cycle modification factor))
- D. Cycle length divided by monthly performance
Answer: A
NEW QUESTION 24
How do you map a counter replacement in SAP S/4HANA Asset Management?
- A. Replace the defective piece of equipment to which a counter is assigned.
- B. Deactivate the current counter and create a new counter.
- C. Create a new measurement document marked as a counter replacement.
- D. Create a new measurement document and assign a valuation code for counter replacement.
Answer: C
NEW QUESTION 25
Which of the following statements about orders with operation account assignment (OAA) are correct?
Note: There are 3 correct Answers to this question.
- A. The settlement rule is maintained on the header level.
- B. A technical object must be assigned to an order operation.
- C. Costs are stored only for the operation object.
- D. Overall costs are dynamically summed up on the header level.
- E. Purchase requisitions have the operation as account assignment.
Answer: B,C,D
NEW QUESTION 26
To which objects can a personnel number be directly assigned? Note: There are 2 correct Answers to this question.
- A. Work center
- B. Planner group
- C. Equipment
- D. Business partner
Answer: A,D
NEW QUESTION 27
In which maintenance object can you use an activity type? Note: There are 2 correct Answers to this question.
- A. Maintenance order operation
- B. Work center
- C. Maintenance order header
- D. Notification activity
Answer: A,B
NEW QUESTION 28
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct Answers to this question.
- A. Start date
- B. Factory calendar
- C. Scheduling indicator
- D. Scheduling period
Answer: A,D
NEW QUESTION 29
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct Answers to this question.
- A. Measurement document
- B. Maintenance plan item
- C. Maintenance plan header
- D. Equipment task list
- E. Work order confirmation
Answer: A,B,E
NEW QUESTION 30
Which statement is correct about the SAP Fiori tile group? Note: There are 2 correct Answers to this question.
- A. It is assigned via a portal role.
- B. It can be assigned directly to the user via personalization.
- C. It is based on an SAP Fiori tile catalog.
- D. It provides only SAPUI5-based apps.
Answer: C,D
NEW QUESTION 31
Which of the following is a prerequisite for external refurbishment?
- A. Activate the subcontracting indicator in an external activity.
- B. Select the material group for externally refurbished materials.
- C. Create the purchasing info record for the external provider.
- D. Define the order type for external refurbishment.
Answer: A
NEW QUESTION 32
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct Answers to this question.
- A. In the report Material: Where-Used List
- B. Within a maintenance order
- C. In the material reservation list in inventory management
- D. In the list editing (single-level) for maintenance orders
Answer: A,B
NEW QUESTION 33
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct Answers to this question.
- A. Assign a serial number profile to the equipment category.
- B. Maintain a serial number for an existing equipment master.
- C. Add a serialized material to the construction type field of the equipment master.
- D. Assign a serial number profile to the related material master.
- E. Add a serialized material to the equipment serial data view.
Answer: C,D,E
NEW QUESTION 34
You require stock material to carry out maintenance tasks. Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct Answers to this question.
- A. Material can be assigned at the order operation level.
- B. The pick list for materials can be printed before order release.
- C. A control key for internal workforce is required when assigning stock material to an order operation.
- D. A goods receipt can be entered for a technically completed maintenance order.
- E. Material can be assigned at the order header level.
Answer: A,C,D
NEW QUESTION 35
Which operations are possible when you cancel the technical completion of a maintenance order? Note:
There are 2 correct Answers to this question.
- A. Book a goods receipt.
- B. Change the priority.
- C. Change the estimated costs.
- D. Cancel status Released.
Answer: A,B
NEW QUESTION 36
Which of the following parameters are available when you define a new maintenance plan category?
Note: There are 3 correct Answers to this question.
- A. Maintenance activity type
- B. Change documents
- C. Order type
- D. Call object
- E. Completion date
Answer: B,D,E
NEW QUESTION 37
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note:
There are 2 correct Answers to this question.
- A. Assign an inspection lot to the task list header.
- B. Assign a measuring point as a production resources/tools (PRT) to a task list operation.
- C. Assign a piece of equipment with an allocated measuring point to a task list operation.
- D. Assign an inspection document as a PRT to the task list operation.
Answer: B,C
NEW QUESTION 38
What do you need to configure to enable entries in the action log of a piece of equipment?
- A. Select the time segment check box for the equipment category.
- B. Activate the change documents for the equipment category.
- C. Define an additional business view for the equipment category.
- D. Define the corresponding history-related field for the equipment reference category.
Answer: B
NEW QUESTION 39
Which functionalities belong to the current portfolio of SAP BusinessObjects Business Intelligence?
Note: There are 2 correct Answers to this question.
- A. SAP Lumira
- B. SAP Crystal Reports
- C. Plant Maintenance Information Systems (PMIS)
- D. SAP QuickViewer
Answer: A,B
NEW QUESTION 40
Which material type is the best choice if you only want to create a structure element within the BOM?
- A. Manufacturer Part (HERS)
- B. Compatible Unit (CBAU)
- C. Maintenance Assembly (IBAU)
- D. Spare Part (ERSA)
Answer: C
NEW QUESTION 41
You want to create a maintenance order with an external order operation that includes service items.
Which of the following statements are correct? Note: There are 3 correct Answers to this question.
- A. The usage of a model service specification is mandatory.
- B. The actual value entry can be recorded only via the service entry sheet.
- C. The assignment of a control key with the service indicator set is mandatory.
- D. The assignment of service master records to an order operation is optional.
- E. The assignment of a service master record is mandatory.
Answer: B,C,E
NEW QUESTION 42
Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management? Note:
There are 2 correct Answers to this question.
- A. You have access to the SAP S/4HANA back-end system.
- B. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
- C. You do NOT have access to the SAP S/4HANA back-end system.
- D. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
Answer: B,C
NEW QUESTION 43
......
SAP C_TS413_2020 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Asset Management" certification exam verifies that the candidate has the fundamental and core knowledge in the area of Asset Management required for the consultant profile. This certificate proves that the candidate has an overall understanding and can implement the knowledge practically in projects to contribute to the success of the planning and implementation phases in a mentored role. Previous project experience is not necessarily a prerequisite to pass this exam.
Latest C_TS413_2020 Exam Dumps - Valid and Updated Dumps: https://www.dumpstorrent.com/C_TS413_2020-exam-dumps-torrent.html
Verified C_TS413_2020 Exam Questions Certain Success: https://drive.google.com/open?id=19E3UvJvZYy6XZ7oaU4IIw_DcCUy9rrqS