Oct 23, 2023 Detailed New C_IBP_2305 Exam Questions for Concept Clearance [Q42-Q66]

Share

Oct 23, 2023 Detailed New C_IBP_2305 Exam Questions for Concept Clearance

C_IBP_2305 Exam Preparation Material with New C_IBP_2305 Dumps Questions.


SAP C_IBP_2305 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Define and view information with user-defined charts and dashboards
  • Configure and use Planning Operators to automate processes in your planning model
Topic 2
  • Optimize the integration scenarios and architecture of your planning solution
  • Solution Architecture & Data Integration
Topic 3
  • Configure supply planning, run various solvers to generate planning results
  • Use the Fiori Launchpad to customize the UI, work with Excel UI

 

NEW QUESTION # 42
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.

  • A. Complex calculation graphs for key figures
  • B. Number of analytics charts displaying key figures' values
  • C. Number of local members and complexity of calculations
  • D. Excessive SAP IBP formatting in the Microsoft Excel UI

Answer: A,D


NEW QUESTION # 43
Which features apply to quota violations modeled with the optimizer?

  • A. Quotas can be modeled for sourcing location, production, and consensus demand.
  • B. Min and Max Quotas have to be the same as sourcing ratios.
  • C. Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.
  • D. The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.

Answer: C


NEW QUESTION # 44
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.

  • A. Filter blocks are imposed when modeling cross-period calculations.
  • B. Filter blocks are imposed when modeling attribute transformations.
  • C. Filter blocks can be visualized in the Key Figure Calculations app.
  • D. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
  • E. Filter blocks are imposed when modeling an attribute as a key figure.

Answer: B,D,E


NEW QUESTION # 45
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?

  • A. Supply optimizer and supply heuristics
  • B. Finite and infinite heuristics
  • C. Finite heuristics only
  • D. Supply optimizer only

Answer: A


NEW QUESTION # 46
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note:
There are 2 correct answers to this question.

  • A. Charts creation in SAP Supply Chain Control Tower
  • B. Supply Heuristics in SAP IBP for sales and operations
  • C. Decoupling Points determination in SAP IBP for demand-driven replenishment
  • D. Demand Sensing with Gradient Boosting (Full)

Answer: B,D


NEW QUESTION # 47
What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.

  • A. Link two analytics charts.
  • B. Display all assigned analytics on a single UI.
  • C. Rename the charts.
  • D. Use drill-down functionality.
  • E. Add process templates.

Answer: B,D,E


NEW QUESTION # 48
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Aggregated constraints
  • B. Adjusted transport receipts
  • C. Transportation lead times
  • D. Minimum lot size
  • E. Maximum lot size

Answer: B,C,E


NEW QUESTION # 49
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.

  • A. Supply chain graph in Supply Chain Network app
  • B. Jobs in the Applications Jobs app
  • C. Snapshot operator in the SAP IBP add-in for Microsoft Excel
  • D. Planning view templates in the SAP IBP add-in for Microsoft Excel

Answer: B,D


NEW QUESTION # 50
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.

  • A. You can add (or delete) planning objects to a planning view after these filters are applied.
  • B. You can only apply one value-based filter per planning view.
  • C. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • D. These filters can be used together with attribute totals in the same planning view.
  • E. These filters are always applied based on the values stored in the database.

Answer: B,C,E


NEW QUESTION # 51
You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.

  • A. SOURCECUSTGROUP
  • B. SOURCEPRODUCTION
  • C. SOURCECUSTOMER
  • D. SOURCELOCATION

Answer: C,D


NEW QUESTION # 52
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.

  • A. Copying multiple key figures can be processed sequentially.
  • B. If necessary target key figures values are disaggregated.
  • C. If necessary source key figures values are disaggregated.
  • D. Copying multiple key figures on different planning levels is not possible.

Answer: A,C


NEW QUESTION # 53
You are developing the functionality and appearance of the Excel UI for SAP IBP business users.Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding?Note:
There are 2 correct answers to this question.

  • A. SAP IBP ribbon extension
  • B. Changing the layout of the master data workbooks
  • C. Changing the member names
  • D. Changing the entries from the Name Manager

Answer: A,B


NEW QUESTION # 54
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.

  • A. Users should have authorization for template administration.
  • B. Activate Local Member Recognition setting is selected.
  • C. Use Excel Cell References in the Report Editor option is selected.
  • D. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.

Answer: A,B


NEW QUESTION # 55
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. Lag-based snapshots are created in the Configuration app for a fixed time range.
  • B. The number of lag-based snapshots are limited to nine levels.
  • C. Target key figures for these snapshots are exposed to the user in planning views.
  • D. Target key figures for these snapshots must have lag as a root attribute in its base planning level.

Answer: A,D


NEW QUESTION # 56
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.

  • A. Purge Non-Conforming Data
  • B. Purge Key Figure Data
  • C. Create Time Periods for Time Profiles
  • D. Purge Master Data

Answer: B,D


NEW QUESTION # 57
Which SAP IBP planning operator can be run to delete planning objects in a certain version?

  • A. Purge Master Data
  • B. Purge Key Figure Data Outside Planning Area Planning Horizon
  • C. Purge Key Figure Data
  • D. Purge Non-Confirming Data

Answer: C


NEW QUESTION # 58
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.

  • A. Attributes
  • B. Modified date
  • C. Reason code
  • D. Scenario ID
  • E. Key figure type

Answer: A,B,C


NEW QUESTION # 59
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.

  • A. Demand sensing of demand data using predictive analytics tools
  • B. Embedded, on-the-fly demand analytics
  • C. Consideration of demand-driven analysis for buffer positioning.
  • D. Detailed statistical analysis of demand data using predictive analytics tools

Answer: B,D


NEW QUESTION # 60
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.

  • A. The key figure is calculated and system editable.
  • B. The key figure is calculated and all editable.
  • C. The key figure is stored and system editable.
  • D. The key figure is stored and all editable.

Answer: D


NEW QUESTION # 61
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.

  • A. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • B. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • C. It checks whether the required planning level master data exists for a subset of input key figures.
  • D. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.

Answer: C,D,E


NEW QUESTION # 62
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm-specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.

  • A. Processing mode
  • B. Discretization
  • C. Global cost factors
  • D. Time profile level

Answer: A,C


NEW QUESTION # 63
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.

  • A. A unit of measure key figure, such as UOM CONVERSION FACTOR
  • B. A special key figure marked as an aggregate key figure (aggregate constraint)
  • C. A currency conversion key figure, such as exchange rate
  • D. A forecast metric key figure, such FCSTMAPE

Answer: A,B


NEW QUESTION # 64
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note:
There are 3 correct answers to this question.

  • A. Aggregated constraints
  • B. Adjusted transport receipts
  • C. Transportation lead times
  • D. Minimum lot size
  • E. Maximum lot size

Answer: B,C,E


NEW QUESTION # 65
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Configure at most two input key figures on the same planning level in a key figure calculation.
  • B. Assign the compound master data type and its component master data types.
  • C. Specify a planning horizon in the planning area for each level of the assigned time profile.
  • D. Configure at least one calculated key figure for the planning area.

Answer: B,C


NEW QUESTION # 66
......

C_IBP_2305 2023 Training With 86 QA's: https://www.dumpstorrent.com/C_IBP_2305-exam-dumps-torrent.html

SAP C_IBP_2305 Certification Exam Questions: https://drive.google.com/open?id=12DYAK7Rvi35eRM2o4WucreHFwpuHMphQ