NEW QUESTION # 18
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
- A. The RAID level in the SVP Maintenance window must be changed.
- B. The RAID level must be changed in Storage Navigator.
- C. The RAID 5 group must be put into DRU mode in Storage Navigator.
- D. Parity groups must be deleted.
Answer: D
NEW QUESTION # 19
Which two tools are available to configure NTP server settings on a VSP E590 system? (Choose two.)
- A. Initial Setup Wizard
- B. Maintenance Utility
- C. HSA Embedded
- D. Storage Navigator
Answer: A,B
NEW QUESTION # 20
Which two statements are correct when adding cache to a VSP E590? (Choose two.)
- A. CMG0 and CMG1 must have the same DIMM type.
- B. This is not supported online.
- C. Cache modules must be installed in CMG1.
- D. Cache Modules must be installed on the CM board.
Answer: A,C
NEW QUESTION # 21
Which program is used to perform the "New Installation" procedure on a VSP midrange system?
- A. GUM
- B. MPC
- C. Webconsole
- D. BECK
Answer: A
NEW QUESTION # 22
A customer wants to upgrade their VSP E790 with a SAS Expansion feature.
What are three requirements? (Choose three.)
- A. In Shared Memory, the Extension1 has to be enabled.
- B. Slots B of both controllers must be available for DKB installation.
- C. Drive Boxes (DBs) with SAS interface have to be added.
- D. Two additional Disk Boards (DKBs) have to be installed.
- E. The SAS Expansion license has to be installed.
Answer: C,D,E
NEW QUESTION # 23
A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.
What are two requirements? (Choose two.)
- A. The RAID Groups in the pool must be formatted with encryption enabled.
- B. The controller board must support encryption.
- C. The RAID level of RAID Groups in the pool must be RAID 6.
- D. At least 20 GB of Shared Memory must be installed.
Answer: A,B
NEW QUESTION # 24
You need to replace a broken disk drive on a VSP G700.
What are two prerequisites? (Choose two.)
- A. The red LED on the drive must be lit.
- B. You must wear a wrist strap for ESD protection.
- C. The Drive Box where the drive is located must be powered down.
- D. You must use the Replace button in the Maintenance Utility before removing the drive.
Answer: B,D
NEW QUESTION # 25
Which program is used to perform the "New Installation" procedure on a VSP F700 system?
- A. SVP Web console
- B. MPC connected to the maintenance LAN port
- C. raidcom CLI
- D. Hitachi Ops Center Administrator
Answer: D
NEW QUESTION # 26
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?
- A. Use the MPC for blocking the PS, then replace it.
- B. Check if the status of the PS is blocked, and if yes, then replace it directly.
- C. Use the Maintenance Utility for blocking the PS, then replace it.
- D. Use the Maintenance Utility for blocking the controller, then replace the PS.
Answer: A
NEW QUESTION # 27
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?
- A. Create a Host Group.
- B. Scan for all WWNs.
- C. Enable Host Group security.
- D. Enable Port Security.
Answer: B
NEW QUESTION # 28
A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available.
Which two actions are automatically performed by the system? (Choose two.)
- A. The Correction Copy process starts.
- B. An alert is generated.
- C. The RAID group is placed in Correction Access.
- D. Dynamic Sparing is started.
Answer: B,D
NEW QUESTION # 29
Which tool monitors a VSP E590 system and reports System Information Messages (SIMs)?
- A. Hitachi Remote Ops Monitor Agent
- B. Hitachi Remote Ops SVP Agent
- C. Hitachi Ops Center Protector
- D. Storage Navigator
Answer: C
NEW QUESTION # 30
What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?
- A. 2.99 TB
- B. 1 TB
- C. 128 TB
- D. 65 TB
Answer: A
NEW QUESTION # 31
You are installing a VSP F370 and you need to connect your laptop to one of the controllers.
What are the two default IP addresses of the maintenance ports of CTL1 and CTL2? (Choose two.)
- A. 192.168.0.17
- B. 10.0.0.17
- C. 192.168.0.16
- D. 10.0.0.16
Answer: C,D
NEW QUESTION # 32
......