
New 1z0-1075-20 Test Materials & Valid 1z0-1075-20 Test Engine
1z0-1075-20 Updated Exam Dumps [2021] Practice Valid Exam Dumps Question
NEW QUESTION 30
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?
- A. Production Operator
- B. Production Supervisor
- C. Production Engineer
- D. Manufacturing Supervisor
- E. Manufacturing Engineer
Answer: E
NEW QUESTION 31
As a production supervisor, you require immediate access to critical shop floor execution systems to take action while on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?
- A. Reviewing customer information of work orders
- B. Reviewing operation, component, and resource detail
- C. Creating a new standard or non standard work order
- D. Executing standard work order and updating item and resource usage
- E. Releasing work orders using quick swipe details
- F. Searching for work orders and sending them through e-mail
Answer: A,B,E,F
NEW QUESTION 32
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.
- A. An item cannot be assigned on an ad hoc basis.
- B. The user doesn't have Override Item Structure Components in the Work Definition privileges.
- C. The user doesn't have Data access to create item structure.
- D. The user doesn't have access to the PIM module.
Answer: A
NEW QUESTION 33
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.
- A. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
- B. Set a local sourcing rule in GOP to determine supply creation option as Make.
- C. Set the global sourcing rule in GOP to determine supply creation option as Make.
- D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
- E. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
Answer: C,E
NEW QUESTION 34
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.
- A. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate
4 units in Availability Override column. - B. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
- C. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
- D. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.
Answer: A
NEW QUESTION 35
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
- A. Create Accounting was not initiated.
- B. Costs for purchase components P1 and P2 are not defined in cost accounting.
- C. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
- D. Create Accounting Distributions was not initiated.
Answer: D
NEW QUESTION 36
Identify three requirements fulfilled by nonstandard work orders.
- A. Repair
- B. Rescheduling
- C. Rework
- D. Prototype
Answer: A,C,D
NEW QUESTION 37
To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.
- A. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock.
- B. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
- C. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
- D. Change the Supply Type = Push in Item definition and Work Definition, for subassemblies having high inventory stock.
Answer: C
NEW QUESTION 38
Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the Manufacturing Cloud?
- A. Use Business Intelligence publisher to create a template and use that template to create the report.
- B. Use Business Intelligence answers to create the report.
- C. Use the Manufacturing subject area to select the report columns and create the report.
- D. Use ibots to create the report.
Answer: A,B
Explanation:
Explanation
You can use Oracle Transactional Business Intelligence to create analysis and Oracle Business Intelligence Publisher to create reports.
NEW QUESTION 39
The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.
- A. Complete with Details
- B. Complete using quantity completion
- C. Change Move status to Ready.
- D. Quick Complete
- E. Change status of Operation to completed
Answer: A,D
NEW QUESTION 40
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of products manufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.
- A. Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and Corporate Engineering organizations as Item Organization.
- B. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Inventory Organization.
- C. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Item Organization.
- D. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Inventory Organization.
- E. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Item Organization
Answer: A,E
NEW QUESTION 41
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.
- A. Ensure that the Charge Type of the resource is Automatic.
- B. Select the Automatically Transact check box while defining the Standard Operation.
- C. Deselect the Count Point check box while defining the Standard Operation.
- D. Select the Count Point check box while defining the Standard Operation.
Answer: D
NEW QUESTION 42
A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.
- A. Define Local sourcing rule for organization MP: Source Type Make At, Source MP
- B. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP
- C. Define Local sourcing rule for organization DW: Source Type Make From, Source MP
- D. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW
Answer: A,B
NEW QUESTION 43
A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management.
Which scheduled process should you run to achieve this requirement?
- A. Transfer Ledger Balances
- B. Transfer General Ledger Balances to Balance Cubes
- C. Transfer Cost to Cost Management
- D. Transfer Transactions to Costing
Answer: C
NEW QUESTION 44
An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order.
Identify two options that can cause this situation.
- A. Sourcing rules for the product item are defined as Make as well as Transfer.
- B. Sourcing rule for the product item is defined as Buy.
- C. Sourcing rules for the product item are defined as Buy as well as Transfer.
- D. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.
Answer: A,D
NEW QUESTION 45
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?
- A. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
- B. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
- C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
- D. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
Answer: B
NEW QUESTION 46
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for that week.
- A. 76 hours
- B. 70 hours
- C. 78 hours
- D. 60 hours
Answer: C
NEW QUESTION 47
In a Manufacturing Cloud post production support environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.
- A. None of the operations include scheduled resources.
- B. The scheduled resources are not part of the organization selected by the user.
- C. The operations are missing sequence.
- D. The work order operations do not have operations start or completion date.
Answer: A,C
NEW QUESTION 48
......
1z0-1075-20 Sample with Accurate & Updated Questions: https://www.dumpstorrent.com/1z0-1075-20-exam-dumps-torrent.html