ATLASSIAN ACP-610 Questions and Answers Guarantee you Oass the Test Easily
Share Latest ACP-610 DUMP with 65 Questions and Answers
NEW QUESTION 16
Teresa is able to see the Start Progress transition but not the Approve transition on an issue. Her co-worker is able to see both.
Identify two possible causes why Teresa can NOT see the Approve transition. (Choose two.)
- A. Teresa does not meet the condition on the Approve transition.
- B. Teresa is not listed in the correct security level for the issue.
- C. Teresa does not have the correct Application access.
- D. Teresa is not in the correct group or project role.
- E. Teresa does not have the Transition Issues permission.
- F. Teresa does not have the correct global permission.
Answer: D,E
NEW QUESTION 17
The Jira administrator has just created a new project based on the Task management project template.
Which Jira feature will be available in this project by default?
- A. Ranking of standard issue types
- B. Epic issue type
- C. Issue security levels
- D. Issue analysis reports
- E. Release Hub
Answer: A
NEW QUESTION 18
How do you configure the default unit for time tracking (minute, hour, day, week) in Jira?
- A. per user
- B. per issue type
- C. per project
- D. per instance
- E. per group
Answer: B
NEW QUESTION 19
Security levels have already been configured in the Legal project's issue security scheme.
Now Dave needs to be able to set a particular security level on an issue in the Legal project. Identify three prerequisites for him to be able to do this. (Choose three.)
- A. Issue-level security must be globally enabled by a Jira administrator.
- B. Dave must have access to the Legal project.
- C. Dave must have the Set Issue Security permission in the Legal project.
- D. Dave must be assigned to that particular security level.
- E. Dave must have a valid Jira Software license.
- F. Dave must be the project administrator of the Legal project.
Answer: A,C,D
NEW QUESTION 20
Users typically forget to add components when they create new issues. As a result, most of the newly created issues get assigned to Tom, who is the project lead.
Tom reviews all of the issues, and wants to triage them based on component selection. But when he edits an issue and adds a component, the assignee does not change.
Why does the assignee not change when adding a component to an issue?
- A. The selected components do not have a component lead set.
- B. The default assignee of the selected components is set to Project default.
- C. Auto-assignment with components only works when creating issues.
- D. The Assignee field additionally needs to be changed to Automatic.
- E. The project's default assignee overwrites the value of the component lead.
Answer: E
NEW QUESTION 21
John needs to configure an Issue Collector where he is the reporter of all the collected issues.
Which two permissions does he need to do this? (Choose two.)
- A. Transition Issues
- B. Create Issues
- C. Add Comments
- D. Administer Projects
- E. Assignable User
Answer: B,D
NEW QUESTION 22
In my project, I can create issues and assign them to other users.
However, the other users are not able to assign issues to me.
What are two possible reasons for this? (Choose two.)
- A. The other users do not have the Assign Issues permission.
- B. The other users do not have the Assignable User permission.
- C. I am not a component lead.
- D. The other users do not have the Edit Issues permission.
- E. I do not have the Assignable User permission.
Answer: A,D
NEW QUESTION 23
Which statement is correct about archiving a version in Jira?
- A. Versions can be archived only in Jira Software projects, not Jira Business projects.
- B. Archived versions will be grouped as Archived Versions in the FixVersion/s field dropdown.
- C. Archived versions cannot be selected in either the Fix Version/s dropdown, or the Affects Version/s field dropdown.
- D. Archived versions can be selected only in the FixVersion/s field dropdown, not the Affects Version/s field dropdown.
- E. Versions can be archived in Jira only if they do not contain any unresolved issues.
Answer: D
NEW QUESTION 24
All users should be able to transition issues in your project without restrictions.
However, some users complain that they cannot transition issues to the In Progress status. They can execute other transitions.
The workflow is shown below.
What should you request from the Jira administrator?
- A. Add a new transition from To Do to In Progress.
- B. Add all project users to the Transition Issues project permission.
- C. Remove existing conditions from the global In Progress transition.
- D. Add a new transition from Done to In Progress.
- E. Remove existing triggers from the global In Progress transition.
Answer: D
NEW QUESTION 25
Malik is a project administrator for the HR project. He cannot remove the Fix Version/s field from the HR project screen.
Why is he NOT able to do this?
- A. The screen is used by another project.
- B. Fix Version/s for the project have been archived.
- C. System fields cannot be removed from screens.
- D. Fix Version/s is a required field.
- E. The Fix Version/s field is locked.
Answer: B
NEW QUESTION 26
An extract of a permission scheme is shown below.
Jennifer Evans needs to be able to:
- Manage project role membership
- Log time to issues
What is the minimum number of project roles she needs?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
NEW QUESTION 27
Your development team has just released their first version of a GPS tracker yesterday. The next product release is not due for another 3 months.
Which two JQL queries, when executed today, will list all features shipped in the 1.0 version? (Choose two.)
- A. project = GPS AND type = Feature AND fixVersion in (1.0)
- B. project = GPS AND issuetype = Feature AND fixVersion in 1.0
- C. project = GPS AND type = Feature AND fixVersion(s) = "1.0"
- D. project = GPS AND issuetype = Feature AND fixVersion(s) IS NOT EMPTY
- E. project = GPS AND issuetype Feature AND fixVersion = released()
- F. project = GPS AND type = Feature AND fixVersion in releasedVersions()
Answer: C,D
NEW QUESTION 28
You want a built-in report that meets these requirements:
- shows the results of a saved filter
- groups the results by priority and shows a progress bar for each priority
- displays issue status and resolution
Which report should you use?
- A. User Workload Report
- B. Recently Created Issues Report
- C. Resolution Time Report
- D. Single Level Group By Report
- E. Time Tracking Report
- F. Created vs. Resolved Issues Report
Answer: B
NEW QUESTION 29
The extract of a permission scheme is shown below.
Clare is joining your team to help out as first-level support.
Her job will be:
- Analyze incoming requests
- requests to subject matter experts
Which two project roles will she need? (Choose two.)
- A. Assigners
- B. Assignables
- C. Editors
- D. Viewers
- E. Administrators
- F. Workers
Answer: A,D
NEW QUESTION 30
Indicate which two use cases require the use of issue-level security within a project. (Choose two.)
- A. Only managers should be able to see Critical issues in the project.
- B. Only managers should be able to see the project.
- C. Only managers should be able to set the Due Date on issues in the project.
- D. Only managers should be able to Close issues in the project.
- E. Only managers should be able to choose who sees certain issues in the project.
Answer: B,E
NEW QUESTION 31
Analyze the workflow scheme for the SSP project shown below:
Which change would require an update to the workflow scheme?
- A. Sub-task and Bug need a different set of statuses.
- B. Story and Epic need a different set of statuses.
- C. Task and Sub-Task need a different screen when being edited.
- D. Story and Task need a different screen when being created.
Answer: A
NEW QUESTION 32
All projects use only a single simplified workflow which has three statuses (Open, In Progress, Closed) and all global transitions.
You need to find all issues that were in the Closed status at some point in their lifecycle.
Select the correct JQL query.
- A. status WAS Closed
- B. status = Closed OR (status WAS Closed AND status = Open)
- C. status CHANGED TO Open
- D. status CHANGED FROM "In Progress" TO Closed
Answer: D
NEW QUESTION 33
The support team has a request.
When a Bug is created, it should only display five fields.
However, when it is edited, it should display fourteen fields.
Which configuration is used to implement this requirement?
- A. Issue Type Scheme
- B. Workflow Scheme
- C. Permission Scheme
- D. Screen Scheme
- E. Field Configuration Scheme
Answer: E
NEW QUESTION 34
The extract of a permission scheme is shown below:
Angela is a new team member. Her main tasks are:
- Search the project for duplicate bugs
- Link them
- Close duplicate bugs in the workflow
Which two project roles does she need? (Choose two.)
- A. Linkers
- B. Creators
- C. Transitioners
- D. Editors
- E. Viewers
- F. Administrators
Answer: A,E
NEW QUESTION 35
......
Dumps for Free ACP-610 Practice Exam Questions: https://www.dumpstorrent.com/ACP-610-exam-dumps-torrent.html
PDF Dumps 2023 Exam Questions with Practice Test: https://drive.google.com/open?id=1-essyvz6sft9q4pLk5pTjAO62NnTLm6e